New build multi-storey car park / central bus station in Kiel

Kiel

In 1972, the Central Bus Station and the multi-storey car park above it were built as a provisional steel structure directly on the Kiel ferry port along Kaistraße on the occasion of the Olympic sailing competitions.

After a longer than anticipated period of use, the ageing existing building was demolished and replaced by a new structure.

As before, the Central Bus Station is located on the ground floor, with 6 levels of parking are above. Internal access is via a counter-rotating circular ramp.

Due to the orientation of the road, the parking lanes are spread at an angle of about 6 degrees. This results in a trapezoidal atrium in the middle of the building. On the First floor level, the car park loads are distributed from above to the load bearing slab and in turn down to the columns of the central bus station via load bearing wall panels.

The facade of the parking garage consists of a brick grid, which required approval in individual cases.

Object

Client:City Kiel
Planning service AMP:General planning in conjunction with gmp Architects
Building contractor:HC Hagemann GmbH & Co. KG

Car park data

Number of parking bays:539 
Parking bay width:2,50 m
Gross car park area:21.200 m2
Net building cost:10.520.000 €
Begin build date:April 2015
Opening date:Oktober 2019