Restoration multi-storey car park, Albstadt-Ebingen

Albstadt-Ebingen

The multi-storey car park situated near the main train station in Ebingen was originally built in 1991. The main body of the building compromises of structural steel composite elements and delivers 524 parking spaces.

A substantial amount of chloride damage was detected, especially on the lower levels of the car park and subsequently further damage caused by corrosion to the concrete reinforcement bars. Due to the nature of the prefabricated construction method employed, the chloride containing melted water from snow could spread unhindered through the numerous construction joints and the corrosion protection coating also showed signs of ageing.

AMP was awarded the contract to produce a design for complete renovation of the car park. In addition to this the ingress / egress would be redesigned to be more spacious and visible. On levels 0 and 1 would be a secure comfort park zone with enlarged parking spaces.

Object

Client:Albstadt Council
Planning services AMP:Inventory, building and drainage planning
Building contractor:BeKor GmbH, Hamburg

Car park data

Number of parking bays:524 
Parking bay width:2,30 m - 2,80 m
Angle of parking bays:90 °
Gross car park area:13,501 m2
Net building cost:2,1 Mio €
Opening date:October 2018